Engineering Projects — Overview |
|
Local Government |
|
|
Northern Peninsula Area Regional Council
Douglas Shire Council |
Consulting Engineer NDRRA Programme Management
Consulting Engineer Contract administration and supervision |
|
Cairns Regional Council
|
Consulting Engineer Contract administration and supervision Superintendent’s Representative Macrossan Street, Port Douglas - Stormwater upgrade Clifton Beach Seawall Front Street, Mossman - redevelopment Cooper Creek crossing EPBC application and upgrade Cape Tribulation/Bloomfield Link Study Local rural road bridge upgrades (various) Road Safety Auditor |
|
Carpentaria Shire Council |
Consulting Engineer Karumba Point boat ramp – investigation and design Beard Crescent industrial subdivision - civil design Road construction and reconstruction works Road Safety Auditor Director of Engineering Services including : NDRRA Program Management Karumba Pedestrian and Bicycle Pathway—design Yappar Street Widening—civil design |
|
Etheridge Shire Council |
Director of Engineering Consulting Engineer |
|
State and Federal Government |
||
|
Department of Main Roads QLD Peninsula District Cairns Northern District Townsville North West District Cloncurry Southern District Toowoomba |
Project management, contract administration and supervision Concept development Road Safety Audits Project Adjudicator - enhanced road condition |
|
|
Road Safety Audits |
Port Douglas / Captain Cook Highway Roundabout Rex Range |
|
|
Department of Transport – PNG |
Project Advisor - trans-island highway project |
$350m |
|
Roads and Traffic Authority (NSW) |
Senior Project Manager Perisher Road Development Project Pacific and Princess’ Highways Development Program |
|
|
Department of Main Roads (QLD) |
Senior Project Manager East Evelyn Road Range, Atherton Tablelands Cooktown Development Road, Peninsula |
$20m $100m |
|
NPRSR Qld Parks and Wildlife Service |
Civil Design and Supervision QPWS South Johnstone River Geotechnical Investigation QPWS Stoney Creek Bridge Design, Wallaman Falls Bridge QPWS Cooktown Sheds, Fongon bay & Kulki Toilet Blocks |
|
|
Indigenous Land Corporation |
Mossman Gorge Road Safety Audit |
|
|
Corporate |
||
|
Boral Resources |
Quality Assurance and Quality Adjudication |
|
|
EGIS Consulting |
Consulting Engineer |
|
|
Stanwell Corporation Limited |
Barron Gorge Power Station: Slope Risk Analyses and Stabilisation Works |
$150k |
|
Port Corporation of Queensland |
Contract administration and supervision Horn Island berthing dolphin and paving upgrade |
$2.38m |
|
Private Development and Consortia |
|
|
|
Habluk |
Batujimba Development, Port Douglas |
$5m |
|
Coastal Pacific Consolidated |
Seapoint on Trinity, Trinity Beach |
$6m |
|
Port Douglas Reef Resorts |
Links 6 Development, Port Douglas |
$5m |
|
Latitude Development Group |
Peppers Coral Coast Resort, Port Douglas |
$55m |
|
FKP / Raglan Joint Venture |
Sabaya Resort, Port Douglas |
$45m |
|
Sheraton Mirage Resort |
Roof Refurbishments to Villas, Port Douglas |
various |
|
Eastcoast Hotels |
Courthouse Hotel Streetscape, Port Douglas |
$280k |
|
Port Douglas Yacht Club |
Seawall remedial design, Port Douglas |
$25k |
|
Port Douglas Yacht Club |
Pontoon Kitchen & Amenities |
|
|
Reorg Pty Ltd |
Mt Somerset Development, Mossman |
$10m |
|
Oakdare Holdings Pty Ltd |
Oakdare Quarries, Mossman-Mt Molloy |
$2m |
|
Juniper Development Group - Port Douglas Projects |
Murphy Street Residence Coconut Grove Resort - slope stabilisation |
$1.5m $49m |
|
NQL Properties |
Mowbray River Development , Port Douglas |
$50m |
|
WAKS Developments Pty Ltd |
Craiglie Business Park Stage 2 Subdivision, Craiglie Includes Paws and Claws site development |
$1m |
|
Ives Family |
Wonga Beach residential subdivision |
|
|
Treetops Body Corporate |
Ramada Resort - fire door assessment and report |
|
|
Mowbray by the Sea |
Repairs |
$25k |
|
The Reef Marina |
Expansion & Fuel containment |
$2m |
|
The Reef Marina |
Residential |
$40m |
|
Rendezvous |
Apartment Repairs |
$6m |
|
Sheraton Mirage |
Pool Cabanas, Engineering |
|
|
Hilrok Hotel Group |
Central Hotel Extension Supervision |
$2m |
|
Thursday Island |
Memorial Wall Design |
$20k |
|
Niramaya Resort and Spa |
Stage 3 Engineering Design |
$26m |
|
|
|
|
|
Tablelands Regional Council |
Atherton Main St Dilapidation Report Consulting Engineer Civil Design |